Tunnel Concrete Construction Lining Trolley

Product Details
Customization: Available
Theoretical Weight: 125 Tons
Material: Q235B
Gold Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Patents Awarded
The supplier had awarded 1 patents, you can check the Audit Report for more information
Quality Assurance
The supplier provides quality assurance
Production Process Visualization
You can check the supplier's production workflow chart or main facilities in the Audit Report
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
to see all verified strength labels (23)
  • Tunnel Concrete Construction Lining Trolley
  • Tunnel Concrete Construction Lining Trolley
  • Tunnel Concrete Construction Lining Trolley
  • Tunnel Concrete Construction Lining Trolley
  • Tunnel Concrete Construction Lining Trolley
  • Tunnel Concrete Construction Lining Trolley
Find Similar Products

Basic Info.

Model NO.
GF-CQTC
Drive Motor Power
2X7.5kw
Tunnel Radius
6.7m
Walking Speed
6m/Min
Hydraulic Cylinder Stroke
200mm-600mm
Hydraulic Motor Power
5.5kw
Hydraulic System Pressure
20MPa
Other
Parameters May Be Adjusted for Specific Projects
Specification
6.1m, 9.1m, 10.5m, 12.1m
Trademark
Gaofeiqiaosui
Origin
Luoyang, Henan

Product Description

Product advantages: reasonable structure, advanced technology, convenient installation, high strength, good stability, high surface smoothness of lining, and fast lining speed. Tunnel Concrete Construction Lining TrolleyTunnel Concrete Construction Lining Trolley
Intelligent information pouring lining trolley

In order to solve the problem of key indicators in the construction process of traditional lining trolleys that cannot be fully digitized and displayed on screen, and to improve the quality of concrete operations completed by the trolleys, our company has launched a new generation of intelligent information pouring lining trolleys, which include: automatic pouring system for window by window pouring, temperature and humidity detection, pouring flow measurement, video monitoring system, arch pressure monitoring system, lap in place detection, pouring liquid level height detection Information cloud platform, intelligent vibration system, automatic track laying and walking system, anti hole warning system, visual sealing device, soft lap, etc. Through the above configurations, tunnel lining construction visualization, digitization, intelligence, and informatization are achieved, making construction easier, supervision simpler, and quality more reliable.
Tunnel Concrete Construction Lining TrolleyTunnel Concrete Construction Lining TrolleyTunnel Concrete Construction Lining TrolleyTunnel Concrete Construction Lining Trolley

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier