Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | Negotiated |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Description: The upper end is connected to the interior of the Ercun trolley panel, with an effective length of 45 centimeters for all ejections. After installing the plug-in vibrator, check the circuit and air circuit for smooth and complete movement of the vibrator. After positioning the Ercun, run the cylinders one by one to eject the vibrator, leaving a gap of 3cm-5cm between the vibrating rod and the top end. |
|
When pouring to the arch, when the concrete overflows the vibrating rod, the information based air defense warning device installed near the vibrating rod will have an alarm light accompanied by a buzzing sound to indicate the location of the concrete. At this time, the first high-frequency vibrating rod can be activated, and the vibration time is based on the concrete flow rate. After the concrete is compacted and discharged, the vibrating rod stops working. The vibrating rod stops working and running. Lower to the position below the trolley panel to ensure that the mold does not collide with the vibrating rod while the trolley is moving. | |
According to the different vibration times of the concrete grade, the self vibration time and vibration frequency of the construction site are different. Attention: If the high-frequency vibrating rod runs idle for less than 20 seconds, prolonged idle operation will directly affect the service life of the vibrating rod |
Company introduction | |
Luoyang Gaofei Bridges and Tunnel Machinery Co., Ltd was established in 2014, located in Luoyang,Henan province. Our main products are intelligent automatic pouring lining trolley, lining trolley without gantry frame, automatic waterproof boardtrolley, self-propelled inverted arch trestle, ditch cable trough trolley,constant temperature and humidity spray maintenance trolley,multi-function arch mounting trolley, single-line steering platforms, various shaped templates and shield machine accessories are necessary for tunnelconstruction, a strong guarantee for the tunnel construction process, and anecessary part of the industrial chain to strengthen the chain. We are focusing on railway (including passenger dedicated line), highway, urban rail, water conservancy and hydropower, municipal and other special engineering construction projects of tunnels, bridges and other fields, We can also design and manufacture special-purpose products according to customer needs. We have worked with ChinaRailway Group,China become cooperative Construction Group,China Railway Construction Corporation, China Communications Construction Company Limited, China State Construction Engineering Group Co.,Ltd, SlNOHYDRO Corporation Limited, China Railway Engineering Equipment Group Co., Ltd., China metal lurgical GroupCorporation,Gezhouba Group Corporation, etc.Our company has two installation and commissioning centers, and has completed the construction of aprovincial scientific research platform--Henan Provincial Lining Trolley Intelligent Complete Equipment Engineering Technology Research Center, as well as Bridge and Tunnel Intelligent Equipment Research Institute, Bridge and Tunnel Trolley Engineering Technology Research Center, and Tunnel Trolley Enterprise R& D center, Municipal Industrial Design Center, business platform for domestic and foreign import and export circulation, etc. |
|
Company Qualifications | |
Packing and shipping | |