Tunnel Waterproof Board Laying Formwork

Product Details
Customization: Available
Drive Motor Power: 2X (3-7.5) Kw
Walking Speed: 6m/Min
Gold Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Patents Awarded
The supplier had awarded 1 patents, you can check the Audit Report for more information
Quality Assurance
The supplier provides quality assurance
Production Process Visualization
You can check the supplier's production workflow chart or main facilities in the Audit Report
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
to see all verified strength labels (23)
  • Tunnel Waterproof Board Laying Formwork
  • Tunnel Waterproof Board Laying Formwork
  • Tunnel Waterproof Board Laying Formwork
  • Tunnel Waterproof Board Laying Formwork
  • Tunnel Waterproof Board Laying Formwork
  • Tunnel Waterproof Board Laying Formwork
Find Similar Products

Basic Info.

Model NO.
GF-FSBTC
Hydraulic Motor Power
5.5kw
Hydraulic System Pressure
20MPa
Other
Parameters May Be Adjusted for Specific Projects
Specification
Hanging cloth 3-6m
Trademark
Gaofeiqiaosui
Origin
Luoyang, Henan

Product Description

Introduction: Automatic waterproof board laying and hanging trolley, including gantry frame, arch track, and cloth hanging mechanical device. The operating platform is composed of hydraulic oil cylinder expansion structure, hydraulic support rod, and back plate, used for extending and retracting the steel bar binding platform on both sides, allowing the two sides of the platform to extend as much as possible to the excavation surface, facilitating workers to weld waterproof boards and bind steel bars, effectively improving operator safety and reducing labor intensityTunnel Waterproof Board Laying Formwork
Automatic waterproof board reinforcement trolleyTunnel Waterproof Board Laying Formwork
Advantages: Reduce construction personnel, reduce investment in construction equipment, and save costs. The construction period of each 12 meter long board is 8 hours, and only 3-4 people are needed to complete the laying and hanging of waterproof board steel bars, greatly improving efficiency, reducing labor intensity of workers, reducing safety risks, and achieving intelligent and mechanized construction, laying a solid foundation for rapid and efficient construction.Tunnel Waterproof Board Laying FormworkTunnel Waterproof Board Laying FormworkTunnel Waterproof Board Laying FormworkTunnel Waterproof Board Laying Formwork

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier