Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | Negotiated |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Tunnel steel formwork full round trolley for hydropower and water conservancy project
Related photos | |
Product Parameter | |
LINING LENGTH | 6.1M,9.1M,10.5M,12.1 M |
MATERIAL | Q235B+Q345B |
DRIVE MOTOR POWER | 11KW |
TUNNEL RADIUS | 3M |
WALKING SPEED | 6M/MIN |
HYDRAULIC CYLINDER STROKE | 200MM-600MM |
HYDRAULIC MOTOR POWER | 5.5KW |
HYDRAULIC SYSTEM PRESSURE | 20MPA |
*PAMAMETES MAY BE ADJUSTED FOR SPECIFIC PROJECTS. |
Company introduction | |
Luoyang Gaofei Bridges and Tunnel Machinery Co., Ltd was established in 2014, located in Luoyang,Henan province. Our main products are intelligent automatic pouring lining trolley, lining trolley without gantry frame, automatic waterproof boardtrolley, self-propelled inverted arch trestle, ditch cable trough trolley,constant temperature and humidity spray maintenance trolley,multi-function arch mounting trolley, single-line steering platforms, various shaped templates and shield machine accessories are necessary for tunnelconstruction, a strong guarantee for the tunnel construction process, and anecessary part of the industrial chain to strengthen the chain. We are focusing on railway (including passenger dedicated line), highway, urban rail, water conservancy and hydropower, municipal and other special engineering construction projects of tunnels, bridges and other fields, We can also design and manufacture special-purpose products according to customer needs. We have worked with ChinaRailway Group,China become cooperative Construction Group,China Railway Construction Corporation, China Communications Construction Company Limited, China State Construction Engineering Group Co.,Ltd, SlNOHYDRO Corporation Limited, China Railway Engineering Equipment Group Co., Ltd., China metal lurgical GroupCorporation,Gezhouba Group Corporation, etc.Our company has two installation and commissioning centers, and has completed the construction of aprovincial scientific research platform--Henan Provincial Lining Trolley Intelligent Complete Equipment Engineering Technology Research Center, as well as Bridge and Tunnel Intelligent Equipment Research Institute, Bridge and Tunnel Trolley Engineering Technology Research Center, and Tunnel Trolley Enterprise R& D center, Municipal Industrial Design Center, business platform for domestic and foreign import and export circulation, etc. |
|
Packing and shipping | |
Company Qualifications | |
FAQ | |
Q: 1.Q: Are you manufacturer or trader? A: We are professional manufacturer in Tunnel lining trolleys for more than 10 years. Q: How long is the design period? A: it normally takes 2-3days. Q: How often should mechanical equipment be maintained? A: The maintenance cycle for mechanical equipment depends on various factors, including the frequency of use, working environment, and manufacturer recommendations. Generally, it is recommended to follow the maintenance plan in the equipment manual and adjust according to actual usage. Q: How to ensure the safe operation of machinery equipment? A: To ensure the safe operation of machinery equipment, it is necessary to provide proper training for operators, ensure all safety precautions are in place, and conduct regular equipment inspections to prevent potential safety hazards. Q: How to optimize the energy consumption of machinery equipment? A: Optimizing the energy consumption of machinery equipment can be achieved through regular maintenance, using energy-saving modes, upgrading to more efficient equipment, and implementing energy monitoring systems. |